TULANGAN BAWAH — Lapangan (Mu⁺ = 20.0 kNm/m) · D10-150
1Tinggi efektif
d = h − selimut − ½·Ø = 200 − 20 − 5 = 175.0 mm
2Luas tulangan terpasang
As = ¼·π·10²·(1000/150) = 523.6 mm²/m (7 btg/m)
3a, c & regangan tarik
a = As·fy/(0.85·f'c·b) = 8.62 mm
c = a/β₁ = 10.32 mm
εt = 0.003(d−c)/c = 0.0479 → φ=0.90 ✓
4Kapasitas & cek
Mn = As·fy·(d−a/2) = 37.54 kNm/m
φMn = 0.90·Mn = 33.78 kNm/m · SR = 0.592 AMAN ✓
As,min = 583.3 mm²/m · As terpasang < As,min NG
TULANGAN ATAS — Tumpuan (Mu⁻ = 20.0 kNm/m) · D10-150
1Tinggi efektif
d = h − selimut − ½·Ø = 200 − 20 − 5 = 175.0 mm
2Luas tulangan terpasang
As = ¼·π·10²·(1000/150) = 523.6 mm²/m (7 btg/m)
3a, c & regangan tarik
a = As·fy/(0.85·f'c·b) = 8.62 mm
c = a/β₁ = 10.32 mm
εt = 0.003(d−c)/c = 0.0479 → φ=0.90 ✓
4Kapasitas & cek
Mn = As·fy·(d−a/2) = 37.54 kNm/m
φMn = 0.90·Mn = 33.78 kNm/m · SR = 0.592 AMAN ✓
As,min = 583.3 mm²/m · As terpasang < As,min NG
5Rekapitulasi Strength Ratio
| Lokasi | Tulangan | Mu | φMn | SR | Status |
| Lapangan (bawah) | D10-150 | 20.0 | 33.78 | 0.592 | AMAN |
| Tumpuan (atas) | D10-150 | 20.0 | 33.78 | 0.592 | AMAN |